More

    Rio Tinto and BHP collaborate on battery-electric haul truck trials in the Pilbara By Investing.com


    PERTH, Australia–(BUSINESS WIRE)–In an industry first, Rio Tinto (NYSE:) and BHP will collaborate on the testing of large battery-electric haul truck technology in the Pilbara, Western Australia, to accelerate the potential for its future deployment.

    This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240526465039/en/

    Komatsu (OTC:) battery-electric haul truck. Credit: Komatsu

    The two companies will work with manufacturers Caterpillar (NYSE:) and Komatsu to conduct independent trials of their battery-electric haul trucks, including testing of battery, static and dynamic charging systems, to assess performance and productivity in the Pilbara environment.

    The collaboration reflects the individual commitments made from BHP, Rio Tinto, Komatsu and Caterpillar to support Rio Tinto and BHP’s shared ambition of net zero operational greenhouse gas emissions by 2050.

    As part of the collaboration, two Cat 793 haul trucks will be trialled from the second half of 2024, and two Komatsu 930 haul trucks tested from 2026 at mine sites in Western Australia’s Pilbara region.

    Caterpillar and Komatsu will each provide one truck each to both BHP and Rio Tinto for these trials. BHP will trial the Caterpillar trucks, while Rio Tinto will trial the Komatsu trucks. Outcomes of the trials will be shared between BHP and Rio Tinto.

    These trials represent the first stage of battery-electric haul truck testing at BHP and Rio Tinto’s Pilbara operations.

    Ongoing testing, development and refinement of truck and battery design is anticipated with each manufacturer. This will inform the approach for testing a larger number of haul trucks and the potential deployment of battery-electric haul truck fleets into each company’s operations.

    Rio Tinto Chief Executive Simon Trott said: This collaboration brings together two leading global miners with two of the world’s biggest manufacturers of haul trucks to work on solving the critical challenge of zero-emissions haulage.

    There is no clear path to net zero without zero-emissions haulage, so it’s important that we work together to get there as quickly and efficiently as we can. Testing two types of battery-electric haul trucks in Pilbara conditions will provide better data, and by combining our efforts with BHP we will accelerate learning.

    As we work to repower our Pilbara operations with renewable energy, collaborations like this move us closer to solving the shared challenge of decarbonising our operations, and meeting our net zero commitments.

    BHP President Australia Geraldine Slattery said: Operational decarbonisation relies on breakthroughs in technology and partnerships like this will help drive our industry forward. We are thrilled to work with Rio Tinto, Caterpillar and Komatsu on these trials.

    Replacing diesel as a fuel source requires us to develop a whole new operational ecosystem to surround the fleet. We need to address the way we plan our mines, operate our haulage networks, and consider the additional safety and operational considerations that these changes will bring. This is why trials are so critical to our success as we seek to test and learn how these new technologies will work in practice and integrate into our mines.

    We’ve already seen a step-change reduction in Scope 1 and 2 operational greenhouse gas emissions through switching some of our supply to renewable electricity, and we are looking to build on that progress through development of battery-electric technology to reduce diesel usage across our operations.

    Note to editors

    In 2021, Rio Tinto and BHP worked with both Caterpillar and Komatsu to support the development and validation of their prototype battery-electric haul trucks. The trucks included in these trials are based on these prototypes.

    Carbon emissions from diesel consumption in our mining equipment and rail fleet accounted for 12% of Rio Tinto’s Scope 1 and 2 emissions in 2023.

    Carbon emissions from the combustion of diesel accounted for around 40% of BHP’s Scope 1 and 2 emissions in FY2020.

    Please direct all enquiries to media.enquiries@riotinto.com

    Media Relations, United Kingdom
    Matthew Klar
    M +44 7796 630 637
    David Outhwaite
    M +44 7787 597 493

    Media Relations, Australia
    Matt Chambers
    M +61 433 525 739
    Jesse Riseborough
    M +61 436 653 412
    Alyesha Anderson
    M +61 434 868 118
    Michelle Lee
    M +61 458 609 322

    Media Relations, Americas
    Simon Letendre
    M +1 514 796 4973
    Malika Cherry
    M +1 418 592 7293
    Vanessa Damha
    M +1 514 715 2152

    Investor Relations, United Kingdom
    David Ovington
    M +44 7920 010 978
    Laura Brooks
    M +44 7826 942 797

    Investor Relations, Australia
    Tom Gallop
    M +61 439 353 948
    Amar Jambaa
    M +61 472 865 948

    Rio Tinto plc
    6 St James’s Square
    London SW1Y 4AD
    United Kingdom
    T +44 20 7781 2000
    Registered in England
    No. 719885

    Rio Tinto Limited
    Level 43, 120 Collins Street
    Melbourne 3000
    Australia
    T +61 3 9283 3333
    Registered in Australia
    ABN 96 004 458 404

    riotinto.com

    Category: General

    Source: Rio Tinto


    https://i-invdn-com.investing.com/news/Coronavirus_800x533_L_1582810340.jpg



    Source link
    Investing.com

    Latest articles

    spot_imgspot_img

    Related articles

    spot_imgspot_img